Stage 3: Testing & Verification
This involves the following steps briefly outlined below.
1) Horn Testing:
- All horns are tested in-house in our purpose built 5 Mtr Anechoic Test Room or Anechoic Chamber.
- Decibel levels are set to customers specifications.
- Decibel Readings are recorded and logged.
- The quality, consistency and clarity of the horn tone is checked to ensure it meets specification.
2) Valve Testing:
- All valves are tested in-house.
- Testing is carried out using our purpose built testing jigs.
- Valves are put through a variety of tests to ensure they are functioning to the required specification.
- All test results are recorded and checked to ensure they meet the required specification.
3) Gauge Testing:
- All Gauges are calibrated in-house in our temperature controlled calibration room.
- Gauge calibration is carried out using nitrogen (lower pressure) or oil (higher pressure).
- All calibration results are recorded and checked to ensure they meet the required specification.
- Calibration Certificates Of Conformity can be supplied upon request.